Gothamist

A non-profit newsroom, powered by WNYC.

Gothamist

WNYC Listen Live

Donate

 

 

News

Inside NYC's First Post-Disaster Housing Units


By

Jen Carlson

Published Jun 10, 2014

Modified Jun 10, 2014


Share

FacebookTwitterRedditEmail


Never miss a story

 Email address

By submitting your information, you're agreeing to receive communications from New York Public Radio in accordance with our Terms .

An exterior shot of the Office of Emergency Management's "Urban Post-Disaster Housing Prototype Program" in Brooklyn Heights- these units are meant to be quickly shipped and assembled to house people after a disaster like Hurricane Sandy.

 

Jake Dobkin/Gothamist

View all 12


By

Jen Carlson

Published Jun 10, 2014

Modified Jun 10, 2014


Share

FacebookTwitterRedditEmail


We rely on your support to make local news available to all

Make your contribution now and help Gothamist thrive in 2026. Donate today

Gothamist is funded by sponsors and member donations

This morning the NYC Office of Emergency Management (OEM), headed up by Commissioner Joseph Bruno, and Design and Construction (DDC) Commissioner Feniosky Pena-Mora unveiled the city's first post-disaster housing prototype.

The prototype, which includes one handicap-accessible unit, is made up of three apartments: one 3-bedroom and two 1-bedrooms, ranging in size from 480-square-feet to 813-square-feet. The space—next to OEM's offices near Cadman Plaza in Brooklyn—mea­sures approx­i­mately 40’ x 100’. Each unit comes with a small balcony, storage space, a kitchen, living space, and bathroom, on top of the bedrooms. For comparison's sake, the microunits that were unveiled last year as part of the city's "adAPT NYC" pilot program ranged from 250 and 370-square-feet.

Here's a timelapse showing how the units were assembled. They are designed to be built on site, allowing people to stay in their neighborhoods in a post-disaster situation, even when they cannot access their own homes.

The housing units are a first-of-its-kind model, and will "test the many facets of disaster housing in an urban environment," Bruno explained, noting that they are a local solution to a national problem.

The prototypes will be tested out in the coming months by some of those who were involved in the project, initially with short stays by OEM and City employees. In addition, "two academic institutions will conduct evaluations throughout the next year: NYU-Poly will study how well the prototype performs as a living space and Pratt will look at how the buildings could be used in large numbers to restore neighborhoods."

There is also a public gallery in the structure, showcasing the project's development process. The OEM tells us, "The first floor contains a public gallery with information about the project and post-disaster housing. It is expected to open in the next few weeks and hours will be posted soon, both on signage outside of the prototype and through OEM’s public channels."

Tagged

disaster housing

oem

office of emergency management

original


Jen Carlson

Jen Carlson is a former WNYC and Gothamist editor.

Read more

Gothamist is funded by sponsors and member donations


Gothamist is funded by sponsors and member donations


MORE news

Man shot by ICE in NYC still has bullet lodged in neck, attorneys say

Oscar Belgal, a 28-year-old immigrant from the Dominican Republic, was in solitary confinement at the Metropolitan Detention Center in Sunset Park on Monday.

By

Liam Quigley

Published Oct 12, 2026 at 11:37 a.m. ET


NY measles spread prompts 'disaster' emergency. It didn't have to be this way, health commissioner says.

The state health commissioner says the disease outbreak is wholly preventable.

By

Elizabeth Shwe

News

NY measles spread prompts 'disaster' emergency. It didn't have to be this way, health commissioner says.

The state health commissioner says the disease outbreak is wholly preventable.

By

Elizabeth Shwe


NYC wants to move deliveries onto the waterways. It's starting with a 55-year-old boat.

By

Liam Quigley

Inside the luxury Greenpoint high-rise powered by a rumbling generator for over a month

By

David Brand

Mayor Mamdani orders review of NYPD use of force policies

By

Michael Sol Warren


Never miss a story

Catch up on the most important headlines with a roundup of essential NYC stories, delivered to your inbox daily.

Sign upEmail address

By submitting your information, you're agreeing to receive communications from New York Public Radio in accordance with our Terms .